"I am writing this reference to confirm that Paul Watson was employed by us on our house build project in June and July 2008.

Paul worked on the two floors of our home doing the following tasks:


On the Second Floor

Paul formed 2 bedroom areas, 1 toilet and a living area using 75mm stud and track.  He used double plasterboard on either side, and 5 cm x 100 kg insulation in the void.  The overall dimensions of the walls were 125mm.  He taped and filled to the edges and joints.


On the First Floor

Here Paul fixed a hidden lighting trough to the living area.  He created a feature wall with concealed lighting to the bedroom and a concealed wall wash lighting using plasterboards.  In addition, he enclosed a wood burning fireplace with fire boards and 5 x cm 100 kg foil-faced Rockwool.

On asking Paul about his tools and having seen them on site I can confirm that he used the following to carry out the work: Laser Level, Hammer Drill, Stanley Knife, Chalk Line, Screw Gun, Plasterboard Lift, Tape Measure, Pad Saw and Battery Drill.

With regard to Paul’s work I have only very positive comments to make.  He was reliable, courteous, tidy, always worked from plan, liaised with us about costs, materials and timescales.  Since the completion of our house we have already recommended Paul to neighbours and friends who have been impressed with the work he has done for us.

I recommend Paul to anyone who is in the process of building their home."

Giorgos Yasseranis and Evie Yasseranis



Reference regarding work carried out on Warehouse property, Likoporia, Corinthia, Greece.

"I would like to confirm that Paul Watson of Odos Dramali, Kato Loutro, 20013, Corinthia, Greece carried out the work detailed below on our warehouse property in April – July 2010, for a total of 31 working days.

  • Paul formed a toilet block, 1 male, 1 female & 1 disabled unit, from 75 mm stud and track.  
  • Paul fitted a plasterboard-ceiling with a hidden lighting trough detail to the perimeter of the proposed dining-area.

Materials used:

  • For the inside toilet areas green plasterboard was used and white plasterboard for other areas.  All walls had 5 cm x 100 kg Rockwool sound installation.  
  • For the eating area, air conditioning ductwork was enclosed with a metal frame and plasterboard.  Corner beads were fitted to all walls of ceiling and all edges were taped and filled.

Tools employed on this project:

  • Laser level, Hammer Drill, Battery Drill, Screw Gun, Plasterboard Lift, Hammer, Snips, Stanley Knife, Chalk Line, Tape Measure. Pad Saw and Pencil.

Paul was both punctual and reliable throughout the period of this project.  He liaised with other tradesmen on the job and carried out the work in the time he had estimated.  Paul had been recommended to us and we were very pleased with both the quality of his work and his attention to detail.

I would highly recommend Paul for any such work."

Louise Kerkeris and Tassos Kekeris